A kitchen project usually takes longer than the fitting stage alone because design, ordering, manufacture, preparation and coordination all happen before installation begins. The exact timescale depends on the kitchen specification and the amount of work required in the room.
Typical stages
- Initial consultation and design brief.
- Measurements, layout development and revisions.
- Final specification and ordering.
- Lead time for cabinetry, worktops and appliances.
- Removal and preparation of the existing room.
- Installation and any follow-on work.
A straightforward replacement can move more quickly than a project involving structural alterations, new electrics, plumbing, flooring or specialist worktops. Bespoke elements may also have longer lead times than standard components.
Why planning matters
Agreeing appliance models, worktop choices and service positions early reduces the risk of delays. A clear project sequence also makes it easier to coordinate different trades.
If you have a target completion date, mention it at the start of the design process so feasibility can be discussed before products are ordered. Contact Bettinsons to talk through your project and timing.